Skip to main content
  1. Home
  2. Technical Blog
  3. Standards Explained
  4. Functional status A to E: how GB/T 28046-1 five-level grading actually works

Functional status A to E: how GB/T 28046-1 five-level grading actually works

On an automotive electronics test report, the "functional status" field is often filled in as an afterthought. It is in fact a defined judgement field: A to E describe how the sample behaved during the test and after it. Grade it wrong and the conclusion loses its meaning — more trouble than testing the wrong condition.

1. What the five levels actually say

GB/T 28046-1 is an identical adoption of ISO 16750-1, so the two divide functional status the same way. The judgement has two dimensions: whether function is normal during the test, and what it takes to recover afterwards.

ClassDuring the testAfter the testRecovery
AAll functions work as designedAll functions normalNo intervention
BFunctions work as designed, individual parameters may exceed the specified toleranceAll back within specified limitsSelf-recovering
COne or more functions do not work as designedNormal operation restoredSelf-recovering
DOne or more functions do not work as designedOperation restoredRequires a simple manual action, such as a power cycle or reset
EFunctions do not work as designedCannot be restoredRequires repair or replacement

Two boundaries are easily confused and worth remembering separately: the point of class B is that the device still works during the test, only the parameters have drifted — it is not an interruption of function. The line between C and D is whether a human action is needed to recover — coming back by itself is C, needing someone to power cycle it is D.

2. Why class C often still counts as a pass

The class itself carries no value judgement. How far down the scale is allowed depends on where the part is mounted and whether a failure threatens safety.

Safety-related parts (braking, steering, airbag control) usually require A — any interruption of function during the test is unacceptable. Comfort and infotainment parts (seat adjustment, ambient lighting, some audio and video modules) allow B or even C: with a self-recovering interruption, all the user notices is that something reconnected.

What actually decides the judgement is not the class table but the "test item by functional status" matrix in the technical agreement. Some OEMs set requirements by functional safety level, allowing different classes for different functions on the same part — and if that detail is not written into the agreement, it can only be guessed.

3. The three most common misjudgements

Writing only "function normal after the test", with no record of the state during it. This is the most widespread problem. With no record during the test, class A cannot be demonstrated at all. Class A requires normal operation throughout, not merely surviving to the end.

No monitoring, so the judgement cannot be made afterwards. If the sample is not powered and not monitored during the test, an interruption of function goes unnoticed. Write the monitoring plan into the test outline at the time of commissioning: continuous power, periodic self-check, logging of fault codes or output states. When TMC LAB handles this kind of work, the monitoring method and sampling interval are agreed before the chamber is started, so the report does not end up able to state only "normal after the test".

Passing off a class D that needs a reset as class C. "It recovers after a power cycle" sounds like self-recovery but is manual intervention. This misjudgement is common in re-testing after corrective action: the circuit is revised, the reset symptom persists, but the class is written from D as C — which buries the problem.

4. How to fix the definitions at commissioning

Three things written into the test outline save trouble later:

  • Function list and priority: which functions must be class A, which may be B or C, item by item;
  • Monitoring plan: how power is applied during the test, how data is acquired, the sampling interval, and how a failure is recorded;
  • Judgement and re-test rules: whether a D or E aborts the run, when to re-test, and how the report expresses it.

These definitions work the same way for electrical load tests; the functional status logic in ISO 16750-2 electrical loads explained can be read alongside this. Running an exploratory round during development to establish the class boundaries is far cheaper than discovering before volume production that the judgement cannot be made — that rhythm is what exploratory development testing versus formal testing describes.

For a full clause-by-clause breakdown see the GB/T 28046 standard page, and the international equivalent on the ISO 16750 standard page.

Turnaround time is arranged according to the actual project. You are welcome to state your target date when submitting samples; we will check it against the current schedule, confirm a feasible plan with you, and update you at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

What is the difference between a test report and an inspection report?

A test report is data-centric—measured values and verdicts, mostly for R&D pre-scan and process records. An inspection report is issued under the accreditation process and is usable for formal scenarios such as customer acceptance and supply-chain audits. Confirm the intended use before commissioning, to avoid redoing it with the wrong type.

How are reports delivered—electronic or paper?

Electronic by default (PDF with signature and seal); paper copies are stated at commissioning and shipped with the report. Chinese and English versions can be issued on request; the English version follows the Chinese original.

If you need data first for internal review, a staged delivery arrangement can be agreed separately.

Do reports have an expiry date?

A report has no statutory validity period—it attests to the submitted sample's performance under the test conditions. The accepting party (customer, OEM, certification body, tender) sets its own limits, usually tied to product version and standard revision.

After design, critical component or supplier changes, the original report generally no longer represents the current product and should be reassessed.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826