Skip to main content
  1. Home
  2. Technical Blog
  3. Standards Explained
  4. ISO 16750-2 electrical loads explained: overvoltage, superimposed AC and start profiles

ISO 16750-2 electrical loads explained: overvoltage, superimposed AC and start profiles

Key takeaways

ISO 16750-2 "Electrical loads" sets out what the vehicle electrical environment does to electronic equipment: superimposed AC voltage, overvoltage, slow and steep supply voltage decrease, start voltage profiles, reverse voltage, ground offset. GB/T 28046-2 corresponds one to one. At the exploratory stage, reproduce the "start transient" and "load dump" conditions first — most intermittent restarts on the vehicle trace back to them.

The voltage of the 12 V (or 24 V / 48 V) battery on a vehicle is never a clean straight line: it drops to a few volts at start, spikes to tens of volts on a generator load dump, and carries ripple whenever a large load switches. ISO 16750-2 turns each of these into a defined test condition.

1. What the standard covers

Part 2 of ISO 16750, "Electrical loads", corresponds to GB/T 28046-2. Typical items include:

  • Superimposed AC voltage: alternator rectifier ripple riding on the DC rail, which tests the filtering on the supply port
  • Overvoltage: load dump and regulator failure, which tests device voltage margin
  • Slow and steep supply voltage decrease: large loads switching in and line drop, the condition behind "the cluster reboots at start"
  • Start voltage profiles: the transient where the starter pulls the battery down, judged by functional status class
  • Reverse voltage and ground offset: reversed connection and a poor ground return

2. Functional status class is the key

The same test is judged by functional status class (A/B/C/D): class A requires full function throughout, class D allows loss of function provided the device recovers by itself afterwards. Which class applies is set by the product's safety role and the customer specification — clusters and safety-related parts are usually class A, comfort parts can be relaxed.

3. How it divides work with EMC

16750-2 covers the supply being dirty in itself; EMC standards (CISPR 25, ISO 11452) cover electromagnetic interference in space and on the harness. They are complementary: conducted emission is about not putting noise onto the harness, electrical loads is about surviving when the noise arrives.

4. How to run an exploratory round

Start by reproducing the start profile and the load dump curve on a programmable supply, and validate the protection circuit (TVS, soft start, watchdog) on the development board; set the curve parameters to the customer specification or the corresponding standard level. Electrical work is cheap and fast to iterate, which makes it a good fit for rolling runs during EVT.

Turnaround time is arranged according to the actual project. You are welcome to state your target date when submitting samples; we will check it against the current schedule, confirm a feasible plan with you, and update you at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

What is the difference between a test report and an inspection report?

A test report is data-centric—measured values and verdicts, mostly for R&D pre-scan and process records. An inspection report is issued under the accreditation process and is usable for formal scenarios such as customer acceptance and supply-chain audits. Confirm the intended use before commissioning, to avoid redoing it with the wrong type.

How are reports delivered—electronic or paper?

Electronic by default (PDF with signature and seal); paper copies are stated at commissioning and shipped with the report. Chinese and English versions can be issued on request; the English version follows the Chinese original.

If you need data first for internal review, a staged delivery arrangement can be agreed separately.

Do reports have an expiry date?

A report has no statutory validity period—it attests to the submitted sample's performance under the test conditions. The accepting party (customer, OEM, certification body, tender) sets its own limits, usually tied to product version and standard revision.

After design, critical component or supplier changes, the original report generally no longer represents the current product and should be reassessed.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826