Skip to main content
  1. Home
  2. Testing Services
  3. Environmental Reliability Testing
  4. Temperature Cycling

Temperature Cycling

High and low temperature and temperature cycling tests

High and low temperature and temperature cycling tests verify functional stability and structural reliability at temperature extremes. Temperature cycling exposes problems better than a constant temperature test, because materials fatigue as they are repeatedly heated and cooled — the most common failure mechanism in real vehicle use.

Test types

High and low temperature storage: the product is stored at extreme temperatures for an extended period, verifying tolerance in the non-operating state.

High and low temperature operation: the product is powered and operating at extreme temperatures, verifying that function remains normal.

Temperature cycling: the product is cycled repeatedly between the two temperature extremes at a set rate, reproducing a full day's cycle from solar soak to night-time condensation.

Rapid temperature change: reproduces the fast thermal shock of specific scenarios, such as moving into a cold environment after rain.

Choosing the severity

The upper and lower limits depend on the actual service environment and mounting location. A product on the dashboard face sees far higher solar soak temperatures than one on the door mirror.

The rate of temperature change matters a great deal. A real vehicle can move from solar soak to a cold environment at several degrees per minute, much faster than the standard default.

The number of cycles depends on the verification objective. Higher cycle counts are more informative for development-stage screening.

Dwell time at each temperature step determines how the thermal stress is distributed.

Common failure modes

SMT solder joint cracking: caused by mismatched thermal expansion coefficients, and worse when the PCB-to-enclosure fixing is poorly designed.

Rising connector contact resistance: metal expansion and contraction change contact pressure.

Seal failure: rubber seals shrink at low temperature and take a permanent set after high-temperature ageing.

Delamination: encapsulants and coatings crack under repeated temperature change.

Display colour shift or slow response: an inherent property of liquid crystal at temperature extremes; going outside the specification range is expected and has to be assessed.

Checks before and after the test

Visual inspection: look for cracks, deformation, seal failure and delamination.

Functional test: compare functional output and key parameters before and after.

X-ray inspection: check for morphological change in solder joints and internal connections.

Cross-sectioning: metallographic examination at the failure location to confirm where the fatigue crack started and how it propagated.

High and low temperature and temperature cycling test setup
High and low temperature and temperature cycling — TMC LAB laboratory test setup

Frequently asked questions

Do temperature cycling and high/low temperature storage both need to be done?

They examine different failure mechanisms, so a combination is recommended. Storage testing looks at non-operating tolerance at extreme temperatures (material properties, package integrity), while cycling looks at fatigue under repeated thermal stress (SMT reliability, connector stability). The specific combination follows product risk and OEM requirements.

What does it mean if quality problems persist after temperature cycling?

It may mean the test conditions do not match the actual service environment. Check three things: whether the temperature limits cover the real extremes, whether the ramp rate is close to the real scenario, and whether the sample mounting matches the vehicle. Another common cause is insufficient design margin — for example, materials with very different thermal expansion coefficients rigidly fixed together.

Service notes

Our laboratory holds both CMA and CNAS accreditation, covers about 10,000 m2 and runs more than 500 sets of equipment. All testing is carried out in our own laboratories — nothing is subcontracted. Plant visits and on-site witnessed testing are welcome.

Scheduling follows the actual project pipeline. You can state your preferred lead time when you submit samples; we will confirm a feasible plan against current capacity and keep you updated at each milestone. Once the report is issued we send the electronic copy; corrective-action advice can be arranged separately.

Test Matrix

Test items and typical conditions

Temperature cycling exposes problems better than a constant temperature — materials fatigue as they are repeatedly heated and cooled, which is the most common failure mechanism in real vehicle use.

Focus Typical conditions Common method Reference standard
Test type High and low temperature storage, high and low temperature operation, temperature cycling, thermal shock Chosen per the verification objective; shock uses a two-chamber rapid transfer GB/T 28046
Temperature steps Cold commonly at the −40 ℃ step; upper temperature set by mounting location Passenger compartment and engine bay differ markedly ISO 16750
Cycle count 30 / 100 / 500 cycles are typical steps Per the customer technical agreement —
Typical failures Solder joint cracking, seal failure, material embrittlement, parameter drift Function re-test and cross-sectioning after the test —

Conditions and limits above are typical ranges for reference. The actual test levels, sample quantity and acceptance criteria follow the mutually confirmed test plan and standard version. Source: the clauses of each referenced standard.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826