Skip to main content
  1. Home
  2. Technical Downloads

Technical Downloads

Sampling guides, process notes, standard quick references and equipment lists grouped by test category — general material is free of charge.

Downloads

Find documents by test category

Items marked “View online” open directly. All other documents are prepared by our engineers to suit your product and test requirements — submit the requirement form or call us, and there is no charge for the material.

Request documents

01 Before Sampling

Sample preparation and submission checklist

Sent by an engineer

Sample quantities, condition, labelling and accompanying documents — so sample issues do not force a re-run and delay your schedule.

Test process milestones explained

View online

Each milestone from requirement discussion and plan confirmation through test execution to report delivery, and what we need from you at every step.

What drives a quotation

Sent by an engineer

The main variables behind a testing quotation — sample quantity, test scope, standard revision and report purpose. Understanding them first makes an enquiry more efficient.

02 EMC

Pre-compliance EMC testing advice

Sent by an engineer

Why pre-compliance testing comes before formal submission during development: which items to run first, the failures that commonly occur and the usual corrective directions.

CISPR 25 limits quick reference

View online

A complete walkthrough of the common class limits, test methods and acceptance criteria — check the class requirements before you submit.

Key points for ESD and transient testing

Sent by an engineer

Typical ESD and surge transient levels, how to choose discharge points, and what to watch in harness routing.

03 Reliability

GB/T 28046 test level quick reference

View online

How the common test items are graded, temperature limits and the basis for choosing cycle counts.

Chamber and shaker equipment list

View online

Models, temperature ranges and stroke parameters of our main environmental test equipment — confirm the capability covers your conditions.

Choosing a salt mist or corrosion test

Sent by an engineer

Where neutral salt mist, cyclic salt mist and corrosive gas testing each apply, plus the special requirements for connector samples.

04 Material

VOC sampling methods compared

Sent by an engineer

Which samples suit the bag method versus the chamber method, how the sampling conditions differ and how the results compare.

RoHS and REACH restricted substance list

Sent by an engineer

Limits, test methods and the disassembly criteria for common restricted substances — self-check before you export.

05 Failure Analysis

Information checklist for failure analysis

Sent by an engineer

Background worth providing when commissioning failure analysis: the failure symptom, operating conditions, batch and any checks already carried out. The more complete the input, the faster the root cause.

Common solder joint failure modes illustrated

Sent by an engineer

How to tell the typical modes apart — insufficient wetting, cold joints, excessive IMC and CAF — by their characteristics.

Note: the documents above are general versions. Actual test levels, sample quantities and acceptance criteria follow the mutually confirmed test plan and the current standard revision; scheduling follows the actual project arrangement. Cannot find what you need? Put the question in the requirement form and our engineers will answer it specifically.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826