Skip to main content
  1. Home
  2. Technical Blog
  3. Materials & Chemistry
  4. GB/T 28046.5 chemical loads: which reagents automotive electronics meet, and how conditions and criteria are set

GB/T 28046.5 chemical loads: which reagents automotive electronics meet, and how conditions and criteria are set

Here is the conclusion first: a chemical load is not a single action but a combination — which reagents, applied at what temperature, for how long, and judged against what afterwards. Get any one of the four wrong and the test is meaningless however neatly it was run. The same plastic part has to survive cleaners, sunscreen and sweat when mounted in the cabin, engine oil, coolant and brake fluid in the engine bay, and de-icing salt as well near the underbody. Copying a peer's reagent list is where this type of test most often falls over.

1. Chemical load tests material compatibility, not corrosion resistance

Automotive parts meet things they should never meet at three stages — assembly, use and service: cleaning agents and release agents on the assembly line, fuel and urea solution at refuelling, brake fluid and antifreeze during service, sunscreen and insect repellent on the user's hands.

These reagents attack polymers and platings along four paths:

  • Swell and softening: plastic absorbs solvent and expands while losing stiffness, and the clips and sealing features fail first;
  • Stress cracking: moulding residual stress combined with reagent attack cracks the part at stress concentrations, often with no visible warning beforehand;
  • Plating and coating damage: acids, alkalis and salts dull, blister and lift the plating, and contact resistance drifts with it;
  • Marking and bonding failure: screen printing, labels and adhesive layers dissolve, and traceability information simply disappears.

This is not the same category of test as salt spray or damp heat. Salt spray looks for electrochemical corrosion in a chloride environment; damp heat looks for insulation degradation and electrochemical migration caused by moisture absorption (conditions and duration classes for the double-85 test); a chemical load asks whether this material is damaged by this reagent. Their failure signatures overlap little, and one conclusion cannot stand in for another.

2. The reagent list is set by mounting location, not by material grade

Choosing reagents by material is a common mistake. The supplier knows it uses PC/ABS, finds a "chemical resistance table for PC/ABS" online, picks a few reagents, runs them and calls it done. The correct order is to fix the location first and then ask what that location is exposed to.

Mounting locationTypical reagent categoriesWhat to focus on
Cabin interior partsCleaners, sunscreen, sweat, beveragesAppearance and feel; on light-coloured parts check discolouration and dulling first
Engine bayEngine oil, coolant, brake fluid, fuelHigh temperature plus reagent; seals and harness sheaths first
Underbody and wheel areaDe-icing salt, muddy water, high-pressure cleanerOverlaps with corrosion testing; plated parts and fasteners dominate
High-voltage compartment (EV)Coolant, electrolyte leakage scenariosBeyond appearance, insulation performance is the key criterion

A note on sourcing: the reagent categories follow the published clause framework of GB/T 28046.5 and ISO 16750-5; for the specific reagents, concentrations, application temperatures and durations, defer to the official clauses and the OEM technical protocol rather than picking a class by experience.

German OEM projects add a layer: corporate standards such as LV 124 have their own media resistance lists and severity classes that do not map exactly onto the national standard (the differences between LV 124 and ISO 16750). Export parts follow the customer protocol; do not simply substitute the national standard's list.

3. Application method is easier to overlook than reagent type

For the same reagent, immersing and wiping differ by orders of magnitude in damage.

Application methodSuitable forPoints to watch
Full immersionSmall plastic parts, O-rings, coated test panelsUse with care on parts with cavities or electronics; residual fluid that cannot be flushed out introduces false failures
Surface wipe / coatingLarge interior and exterior trim, display coversWipe force, number of passes and contact time must be fixed, otherwise it cannot be reproduced
Vapour / atmosphere exposureFuel vapour, evaporating cleaner scenariosRequires dedicated vessels; results are not interchangeable with immersion data

Harnesses and connectors are the classic case of parts that must not be immersed whole. Once reagent gets into the terminal cavity, the only cleanup available is drying, and the residue changes contact resistance; the drift measured afterwards cannot be separated into reagent attack and residue contamination.

4. A chemical load is often pre-treatment, not the end point

In automotive validation flow, a chemical load frequently sits at the front of a sequence: let the material meet the reagent first, then stack temperature cycling, damp heat or mechanical load, and what you are looking at is whether the attacked part still withstands subsequent stress.

Reverse the order and the conclusion changes. Run the climatic test first and the surface microcracks and moisture state have already changed, which changes the reagent penetration path, so the two data sets cannot be compared. The test sequence therefore has to be fixed on the order form; do not let scheduling decide it (condition differences for mechanical loads).

5. Without clear acceptance items, the report has no conclusion

Acceptance items normally fall into four directions:

  • Appearance: discolouration, dulling, blistering, cracking, tackiness, compared under a standard light source and colour chart;
  • Dimensions and mass: change in critical dimensions and gain or loss of mass, used to quantify swelling and leaching;
  • Function and electrical performance: functional status class, insulation resistance, contact resistance drift;
  • Material property retention: retention ratios such as tensile strength and elongation at break.

When TMC LAB takes on a chemical load commission, the reagent list, the application method and the acceptance basis all go into the test plan first and are confirmed with the customer before work starts. Who supplies the acceptance basis — drawing, technical protocol or internal specification — must be written on the order form: at OEM review, acceptance items without a stated basis are not accepted.

6. A few straight answers

Chemical load is easily reduced to a formality: pick a few common reagents, soak the part, take a photo, write "no significant change", and the report is done. Such a report may survive internal review, but one question about where the reagent list came from exposes it at customer audit.

The time-saving approach is to spend the effort before submitting samples: align the mounting location, the reagents involved, the application method, the subsequent test sequence and the acceptance basis in one go. Write all five on the order form and there is normally no rework afterwards.

To work through the clause framework first, see the GB/T 28046 environmental testing and ISO 16750 standard pages; the matching material services are restricted substance screening and plating thickness and mechanical properties.

Turnaround time is arranged according to the actual project. You are welcome to state your target date when submitting samples; we will check it against the current schedule, confirm a feasible plan with you, and update you at each milestone.

Related Q&A

Related questions

Frequently asked questions on the same topic. The first paragraph of each answer is the conclusion.

What is the difference between a test report and an inspection report?

A test report is data-centric—measured values and verdicts, mostly for R&D pre-scan and process records. An inspection report is issued under the accreditation process and is usable for formal scenarios such as customer acceptance and supply-chain audits. Confirm the intended use before commissioning, to avoid redoing it with the wrong type.

How are reports delivered—electronic or paper?

Electronic by default (PDF with signature and seal); paper copies are stated at commissioning and shipped with the report. Chinese and English versions can be issued on request; the English version follows the Chinese original.

If you need data first for internal review, a staged delivery arrangement can be agreed separately.

Do reports have an expiry date?

A report has no statutory validity period—it attests to the submitted sample's performance under the test conditions. The accepting party (customer, OEM, certification body, tender) sets its own limits, usually tied to product version and standard revision.

After design, critical component or supplier changes, the original report generally no longer represents the current product and should be reassessed.

These answers share the same data source as the FAQ page.

Have a testing requirement? Send us your product details

Tell us the product model and test requirements. Our engineers will map out the test plan, the applicable standards and the item combination, and provide a quotation reference. The more specific the request, the sharper the answer.

  • Free scoping of the test plan and standards
  • Pre-scan testing during R&D to cut rework cost
  • On-site visits and witnessed testing supported
  • Scheduling per project, with progress updates at each milestone

Received — we will contact you shortly and follow up with a test plan and quotation.

By submitting you agree to be contacted by phone or email. Scheduling follows the project’s actual availability and is subject to mutual confirmation.

13510907826